Malta–Sicily Interconnector

The AC cable that ended Malta's electrical isolation in 2015, running 95 km under the sea to Sicily.

Route © OpenStreetMap contributors; outlines: Natural Earth.

Route
Malta to Italy
From
Magħtab, Malta
To
Ragusa, Sicily
Length
120 km
Of which subsea
95 km
Capacity
200 MW
Voltage
220 kV
Type
HVAC · subsea and land cable
Status
In service (checked September 2026)
In service since
2015
Operators
Interconnect Malta
Built by
Nexans

Until March 2015, every kilowatt-hour used in Malta was generated on the islands. The Malta–Sicily Interconnector changed that. A 200 MW alternating-current cable, it came ashore at Qalet Marku in Magħtab, in the locality of Naxxar, and ran 95 km under the sea to Marina di Ragusa on the south coast of Sicily. From there a 25 km underground section takes it to the Ragusa substation.

The motive was isolation. Malta had no connection to any other grid, and the government also wanted to close the ageing Marsa power station. According to the Wikipedia article on the interconnector, the 2015 projection was that Malta’s interconnection level would go from zero to about 35%. The cable was laid in 2014 and 2015 by the Nexans ship Nexans Skagerrak, and the project cost €182 million.

Direct current was not needed. At 95 km of sea, an AC cable is still workable, and it avoids the cost of converter stations at each end. The islands and Sicily sit in the same synchronous area, so the link simply extends the European AC grid to Malta. The longer, deeper Mediterranean cables, such as SAPEI, use DC.

In practice the cable supplied 23.1% of the power generated for Malta in 2019. It also showed the risk of relying on one cable. On 23 December 2019 a ship’s anchor damaged it and caused power cuts across the islands. Nexans spliced in a length of spare cable and the link was re-energised on 12 March 2020, cable industry press reported, less than three months after the damage.

That incident made the case for a second cable. The Malta–Sicily Second Interconnector will run in parallel between the same two substations, so that Malta can keep its supply when one cable or one large power plant is lost. The first cable was originally owned by Enemalta and is now operated by Interconnect Malta.

Against the other links

Malta–Sicily Interconnector in brief

How long is Malta–Sicily Interconnector?

120 km, of which 95 km under the sea, which makes it the 47th longest of the 54 links in this directory with a published length.

How much power can Malta–Sicily Interconnector carry?

200 MW at 220 kV, 60th of 60 by capacity here.

When did Malta–Sicily Interconnector open?

Malta–Sicily Interconnector entered service in 2015.

Which countries does Malta–Sicily Interconnector connect?

Malta and Italy: Magħtab, Malta to Ragusa, Sicily.

Who operates Malta–Sicily Interconnector?

Interconnect Malta.

Who built Malta–Sicily Interconnector?

Nexans.

Background reading

  1. GuideSubsea power cables: how installation, protection and repair work on the seabed
  2. Demonstration 4Repowering transmission lines: reconductoring and dynamic line rating on Europe's AC grid

Nearby links

  1. Malta–Sicily Second InterconnectorMalta to Italy · 225 MW · Under construction
  2. Tyrrhenian Linkwithin Italy · 1,000 MW · Under construction
  3. Italy–Greece HVDC (GRITA)Italy to Greece · 500 MW · In service
  4. SAPEIwithin Italy · 1,000 MW · In service

All power links on the map