Shetland HVDC Link

The subsea cable that connected Shetland to the British grid for the first time and turned the Caithness–Moray link into a three-terminal system.

Route © OpenStreetMap contributors; outlines: Natural Earth.

Route
within Great Britain
From
Kergord, Shetland
To
Noss Head, near Wick
Length
260 km
Of which subsea
250 km
Capacity
600 MW
Voltage
320 kV
Type
HVDC · VSC · subsea cable
Status
In service (checked September 2026)
In service since
2024
Operators
SSEN Transmission
Built by
Hitachi Energy (converters); NKT (cable)

Shetland is, by the Met Office’s measure, the windiest place in the United Kingdom, with an average wind speed of 14.6 knots. Until August 2024 that wind had nowhere to go: the islands had no electrical connection to mainland Britain. The Shetland HVDC Link changed that when SSEN Transmission energised it.

The cable runs about 260 km, all but some 10 km of it under the North Sea according to SSEN Transmission, from the converter station at Kergord, in the centre of Shetland, to a switching station at Noss Head, near Wick in Caithness. From there it joins the existing Caithness–Moray link, which had been designed years earlier to accept a third terminal. The result is a three-ended DC network, the first multi-terminal HVDC system in Europe and, SSEN says, the second in the world after one in China.

The first customer is the Viking wind farm on Shetland. SSEN expects it to produce about 1,800 GWh a year, enough for around 500,000 homes, and the link can carry 600 MW of generation from the islands.

The cable went in over three campaigns in 2022 and 2023, laid by the specialist vessel NKT Victoria, with the final section placed in autumn 2023. Hitachi Energy supplied the HVDC technology, a ±320 kV voltage-source design, and NKT the cable system; BAM Nuttall did the civil works and a Siemens and BAM joint venture the AC substation. SSEN’s managing director Rob McDonald said the project was “delivered ahead of time, on budget, and above all safely”.

One piece was still to come. The link was also meant to supply Shetland itself, through a new grid supply point at Gremista near Lerwick and new 132 kV circuits, with completion targeted for the end of 2025. For a wider view of how remote generation is brought ashore, see the guide to energy islands and the project’s first demonstration on HVDC links for offshore wind.

Against the other links

Shetland HVDC Link in brief

How long is Shetland HVDC Link?

260 km, of which 250 km under the sea, which makes it the 26th longest of the 54 links in this directory with a published length.

How much power can Shetland HVDC Link carry?

600 MW at 320 kV, 45th of 60 by capacity here.

When did Shetland HVDC Link open?

Shetland HVDC Link entered service in 2024.

Which countries does Shetland HVDC Link connect?

It runs within Great Britain, from Kergord, Shetland to Noss Head, near Wick.

Who operates Shetland HVDC Link?

SSEN Transmission.

Who built Shetland HVDC Link?

Hitachi Energy (converters); NKT (cable).

Background reading

  1. GuideSubsea power cables: how installation, protection and repair work on the seabed
  2. Direct currentHVDC transmission explained: the cable, the converter station and why DC wins

Nearby links

  1. Caithness–Moray HVDC Linkwithin Great Britain · 1,200 MW · In service
  2. North Sea LinkGreat Britain to Norway · 1,400 MW · In service
  3. Eastern Green Link 2within Great Britain · 2,000 MW · Under construction
  4. Eastern Green Link 1within Great Britain · 2,000 MW · Under construction

All power links on the map