In service · HVDC · subsea
Caithness–Moray HVDC Link
A 320 kV HVDC cable across the Moray Firth, built to move power from the far north of Scotland and later joined by Shetland.
Route © OpenStreetMap contributors; outlines: Natural Earth.
- Route
- within Great Britain
- From
- Spittal, Caithness
- To
- Blackhillock, Moray
- Length
- 160 km
- Capacity
- 1,200 MW
- Voltage
- 320 kV
- Type
- HVDC · VSC · subsea and land cable
- Status
- In service (checked September 2026)
- In service since
- 2018
- Operators
- SSEN Transmission
- Built by
- ABB (now Hitachi Energy) converters; NKT (cable)
The final bill was £970 million. The Caithness–Moray link had been budgeted at £1.1 billion, and when SSE completed it in January 2019 it came in under that figure, NS Energy reported. Cost overruns are the usual story in transmission; this one ran the other way.
The link crosses the Moray Firth, the wide inlet between Caithness and the coast east of Inverness. From the converter station at Spittal, in Caithness, the route runs underground to the sea, crosses about 113 km of seabed and continues on land to Blackhillock, near Keith in Moray. The total transmission length is nearly 160 km. The regulator approved it in 2014, and it has been in commercial operation since the end of 2018.
The reason was the grid in the far north. The link lets up to 1,200 MW of additional generation reach the main Scottish grid at Blackhillock. Hitachi Energy, which built the converters as ABB, notes that the two stations are not the same size: Blackhillock is rated at 1,200 MW, Spittal at 800 MW.
The link was designed from the start to accept a third terminal: a cable from Shetland. The Shetland HVDC link was energised in August 2024, and together the two form Europe’s first multi-terminal VSC HVDC system. Hitachi Energy calls it the second in the world.
Multi-terminal DC grids were one of the research questions of the BEST PATHS project, whose third demonstration looked at upgrading an older multi-terminal line in Italy. Caithness–Moray is where that idea runs commercially in the North Sea region today.
NKT supplied the cable. Hitachi Energy also holds a five-year service agreement for the converter stations, covering remote monitoring and round-the-clock support.
Against the other links
- 41st longest of the 54 links with a published length; the longest is Tyrrhenian Link at 970 km.
- 18th largest by capacity of 60; SuedLink leads with 4,000 MW.
- Other links from the same countries: AQUIND Interconnector, BritNed, East–West Interconnector, ElecLink, Greenlink, IFA (Interconnexion France-Angleterre), IFA2, LionLink and 8 more.
Caithness–Moray HVDC Link in brief
How long is Caithness–Moray HVDC Link?
160 km, which makes it the 41st longest of the 54 links in this directory with a published length.
How much power can Caithness–Moray HVDC Link carry?
1,200 MW at 320 kV, 18th of 60 by capacity here.
When did Caithness–Moray HVDC Link open?
Caithness–Moray HVDC Link entered service in 2018.
Which countries does Caithness–Moray HVDC Link connect?
It runs within Great Britain, from Spittal, Caithness to Blackhillock, Moray.
Who operates Caithness–Moray HVDC Link?
SSEN Transmission.
Who built Caithness–Moray HVDC Link?
ABB (now Hitachi Energy) converters; NKT (cable).