Estlink 2

The second and larger cable between Estonia and Finland, and the one that showed how exposed Baltic seabed links are.

Route © OpenStreetMap contributors; outlines: Natural Earth.

Route
Estonia to Finland
From
Püssi
To
Anttila, Porvoo
Length
170 km
Of which subsea
145 km
Capacity
650 MW
Voltage
450 kV
Type
HVDC · LCC · subsea and land cable
Status
In service (checked September 2026)
In service since
2014
Operators
Elering, Fingrid
Built by
Siemens (converters); Nexans (cable)

Christmas Day 2024 is the date most people now attach to Estlink 2. That day an unplanned outage cut the Estonia–Finland crossing from 1,016 MW to 358 MW. Finnish authorities escorted the tanker Eagle S into Finnish waters and linked it to Russia’s so-called shadow fleet; the damage was traced to a dragged anchor. The repair took until 18 June 2025, when the link returned to full service. It was the second long outage of 2024: from 26 January to 4 September the link had already been out with a cable fault near the Estonian coast.

The link exists because Estlink 1 was not enough. A Baltic Sea grid study finished in early 2009 concluded that the Baltic states needed stronger ties to the Nordic and continental markets. Fingrid’s project page records the rest: planning from spring 2009, main permits in November and December 2010, cable laying in autumn 2012 and testing in autumn 2013. A trial period ran from 6 December 2013 to 6 February 2014, when commercial operation began, and the link was formally opened on 6 March 2014. With it, the Finland–Estonia border reached 1,000 MW.

The route starts at the Püssi converter station in north-east Estonia, runs about 11 km underground to the coast, then crosses the Gulf of Finland to the Nikuviken cable terminal in Finland. The last stretch, about 14 km, is overhead line into the Anttila station at Porvoo. The budget was €320 million, of which the EU contributed €100 million.

Unlike its predecessor, Estlink 2 uses line-commutated converters, the older thyristor design, at a higher voltage. The figures show the difference: two links on the same border, built eight years apart, on two different converter technologies.

How seabed cables are exposed to anchors is covered in the guide to subsea power cables. The Wikipedia account of the Estlink cables keeps the dates. For Estlink 2 itself, the June 2025 restart left one open question: how the operators will guard a cable whose position is on every chart.

Against the other links

  • 38th longest of the 54 links with a published length; the longest is Tyrrhenian Link at 970 km.
  • 40th largest by capacity of 60; SuedLink leads with 4,000 MW.
  • Other links from the same countries: Aurora Line.

Estlink 2 in brief

How long is Estlink 2?

170 km, of which 145 km under the sea, which makes it the 38th longest of the 54 links in this directory with a published length.

How much power can Estlink 2 carry?

650 MW at 450 kV, 40th of 60 by capacity here.

When did Estlink 2 open?

Estlink 2 entered service in 2014.

Which countries does Estlink 2 connect?

Estonia and Finland: Püssi to Anttila, Porvoo.

Who operates Estlink 2?

Elering and Fingrid.

Who built Estlink 2?

Siemens (converters); Nexans (cable).

Background reading

  1. GuideBaltic synchronisation: leaving BRELL and joining the European grid
  2. GuideSubsea power cables: how installation, protection and repair work on the seabed
  3. Direct currentHVDC transmission explained: the cable, the converter station and why DC wins

Nearby links

  1. Estlink 1Estonia to Finland · 350 MW · In service
  2. Estlink 3Estonia to Finland · 700 MW · Planned
  3. Fenno-Skan 1Finland to Sweden · 500 MW · In service
  4. Fenno-Skan 2Finland to Sweden · 800 MW · In service

All power links on the map