In service · HVDC · subsea
Nemo Link
The first electricity link between the United Kingdom and Belgium, running from Pegwell Bay to Zeebrugge beach.
Route © OpenStreetMap contributors; outlines: Natural Earth.
- Route
- Great Britain to Belgium
- From
- Richborough, Kent
- To
- Herdersbrug, Bruges
- Length
- 140 km
- Of which subsea
- 130 km
- Capacity
- 1,000 MW
- Voltage
- 400 kV
- Type
- HVDC · VSC · subsea cable
- Status
- In service (checked September 2026)
- In service since
- 2019
- Operators
- National Grid, Elia
- Built by
- Siemens (converters); J-Power Systems (cable)
In its first five years Nemo Link moved 29 TWh of electricity, 24.75 TWh of it towards the UK and 4.25 TWh towards Belgium, with availability above 99%. Those figures, quoted in the Nemo Link article, say two things at once: the cable almost never failed, and about 85% of what it carried went west to Britain.
It was the first electrical connection between the two countries. The cable comes ashore at Pegwell Bay in Kent and runs to a converter station at Richborough. On the Belgian side it lands on Zeebrugge beach and connects at Herdersbrug, near Bruges. Of the 140 km route, 130 km is under water.
The main contracts, worth about €500 million in total, were awarded in 2015: Siemens for the converter stations and J-Power Systems for the cable. DeepOcean laid the cable in 2017 and 2018, and the link became fully operational on 31 January 2019. The official opening had come earlier, on 5 December 2018 at Herdersbrug. The European Commission had designated Nemo a Project of Common Interest, and the site crews passed one million working hours without an injury in September 2017, an achievement that earned the project a Sword of Honour safety award that year. Siemens describes its HVDC Plus voltage-source scheme at ±400 kV, with converter stations at both ends.
Nemo Link is a joint venture between National Grid and Elia, the Belgian grid operator. On the evidence of those five years, it works mainly as an import route for Britain; the reverse flow is real but small.
If you compare it with the older Dutch link BritNed, Nemo is shorter and uses the newer converter technology explained in the HVDC section. Its annual capacity works out at 8.76 TWh, so the five-year total of 29 TWh means the cable ran at roughly two-thirds of its theoretical maximum.
Against the other links
- 44th longest of the 54 links with a published length; the longest is Tyrrhenian Link at 970 km.
- 27th largest by capacity of 60; SuedLink leads with 4,000 MW.
- Other links from the same countries: ALEGrO, AQUIND Interconnector, Caithness–Moray HVDC Link, East–West Interconnector, Eastern Green Link 1, Eastern Green Link 2, Greenlink, IFA2 and 9 more.
Nemo Link in brief
How long is Nemo Link?
140 km, of which 130 km under the sea, which makes it the 44th longest of the 54 links in this directory with a published length.
How much power can Nemo Link carry?
1,000 MW at 400 kV, 27th of 60 by capacity here.
When did Nemo Link open?
Nemo Link entered service in 2019.
Which countries does Nemo Link connect?
Great Britain and Belgium: Richborough, Kent to Herdersbrug, Bruges.
Who operates Nemo Link?
National Grid and Elia.
Who built Nemo Link?
Siemens (converters); J-Power Systems (cable).