Best Paths

In service · HVDC · subsea

Fenno-Skan 2

The second HVDC cable between Finland and Sweden, which raised the capacity across the Gulf of Bothnia by 40 percent.

Route © OpenStreetMap contributors; outlines: Natural Earth.

Route
Finland to Sweden
From
Rauma
To
Finnböle
Length
300 km
Of which subsea
200 km
Capacity
800 MW
Voltage
500 kV
Type
HVDC · LCC · subsea and land cable
Status
In service (checked September 2026)
In service since
2011
Operators
Fingrid, Svenska kraftnät
Built by
ABB (converters); Nexans (cable)

Two months after it opened, Fenno-Skan 2 was out of action. In February 2012 a German ship dropped anchor on top of the new cable and damaged it. According to the Fenno–Skan article on Wikipedia, the outage cost Finnish consumers and industry an estimated €80 million in higher electricity prices over those two months, which gives a rough sense of what the link was worth to the market.

It had been built because the Finland–Sweden border was short of capacity. Fingrid and Svenska kraftnät ran the project jointly, and the stated aim, as T&D World reported at completion, was to improve the working of the Nordic electricity market considerably. The new cable raised transmission capacity between the two countries by 40 percent.

The route shares its Finnish end with Fenno-Skan 1 at Rauma. From there roughly 200 km of cable crosses the Gulf of Bothnia, and the Swedish converter stands at Finnböle, built at the same time as the cable. Nexans made the cable at its Halden factory in Norway; ABB supplied the converters. A trial period began on 15 November 2011, when part of the capacity was already open to the market, and full capacity followed on 16 December 2011.

The cost is quoted two ways. T&D World gave about €315 million for the whole construction, while Wikipedia cites €150 million. The two numbers cannot describe the same scope; the larger one was published at completion and is the one to quote.

Fenno-Skan 2 is the newer half of a pair that is about to change. Fingrid and Svenska kraftnät plan to replace the 1989 cable with an 800 MW Fenno-Skan 3 by around 2038. When that happens, this link becomes the older of the two, and the gulf will carry 1,600 MW of HVDC on two cables of equal size.

Against the other links

Fenno-Skan 2 in brief

How long is Fenno-Skan 2?

300 km, of which 200 km under the sea, which makes it the 22nd longest of the 54 links in this directory with a published length.

How much power can Fenno-Skan 2 carry?

800 MW at 500 kV, 31st of 60 by capacity here.

When did Fenno-Skan 2 open?

Fenno-Skan 2 entered service in 2011.

Which countries does Fenno-Skan 2 connect?

Finland and Sweden: Rauma to Finnböle.

Who operates Fenno-Skan 2?

Fingrid and Svenska kraftnät.

Who built Fenno-Skan 2?

ABB (converters); Nexans (cable).

Background reading

  1. GuideSubsea power cables: how installation, protection and repair work on the seabed
  2. Direct currentHVDC transmission explained: the cable, the converter station and why DC wins

Nearby links

  1. Fenno-Skan 1Finland to Sweden · 500 MW · In service
  2. Estlink 3Estonia to Finland · 700 MW · Planned
  3. Estlink 1Estonia to Finland · 350 MW · In service
  4. Estlink 2Estonia to Finland · 650 MW · In service

All power links on the map