Best Paths

In service · HVDC · subsea

COBRAcable

A 700 MW cable between the Dutch and Danish grids, designed so an offshore wind farm could be plugged in later.

Route © OpenStreetMap contributors; outlines: Natural Earth.

Route
Netherlands to Denmark
From
Eemshaven, Groningen
To
Endrup, near Esbjerg
Length
325 km
Capacity
700 MW
Voltage
320 kV
Type
HVDC · VSC · subsea cable
Status
In service (checked September 2026)
In service since
2019
Operators
TenneT, Energinet
Built by
Siemens (converters); Prysmian (cable)

Two cables, each 13 cm across, lie side by side for 325 km under the German Bight. Together they make COBRAcable, the first direct power link between the Netherlands and Denmark, running from Eemshaven in Groningen to Endrup near Esbjerg on the west coast of Jutland.

The aim, in the words of the COBRAcable article, was to strengthen the European grid so that more variable wind power could enter the system while keeping supply reliable. One design choice looks ahead: the link was built so that an offshore wind farm could be connected to it at a later stage. That makes it an early step towards the hybrid links now planned in the North Sea, such as LionLink.

The European Commission named COBRA a Project of Common Interest in November 2015, which brought subsidy support. TenneT and Energinet signed contracts with Siemens and Prysmian in 2016. Onshore work began in Denmark in October 2016 and in the Netherlands in January 2017, and after testing over the summer the link was commissioned in September 2019. It cost DKK 4.7 billion, about €580 million. T&D World’s report on the Siemens order describes a 700 MW voltage-source scheme at ±320 kV, with fibre-optic communication built into the cable.

The first months were busy. In its first half-year the link ran at a 79% capacity factor, moving 1,400 GWh to the Netherlands and 700 GWh to Denmark. Then, in September 2020, a fault put it out of action until January 2021.

The Dutch end is shared ground: NorNed from Norway also lands at Eemshaven. The seabed share of the 325 km route has not been published separately, though almost all of it crosses the German Bight.

Against the other links

COBRAcable in brief

How long is COBRAcable?

325 km, which makes it the 19th longest of the 54 links in this directory with a published length.

How much power can COBRAcable carry?

700 MW at 320 kV, 34th of 60 by capacity here.

When did COBRAcable open?

COBRAcable entered service in 2019.

Which countries does COBRAcable connect?

Netherlands and Denmark: Eemshaven, Groningen to Endrup, near Esbjerg.

Who operates COBRAcable?

TenneT and Energinet.

Who built COBRAcable?

Siemens (converters); Prysmian (cable).

Background reading

  1. GuideEnergy islands: Bornholm, the North Sea island and Princess Elisabeth
  2. GuideSubsea power cables: how installation, protection and repair work on the seabed
  3. Direct currentHVDC transmission explained: the cable, the converter station and why DC wins

Nearby links

  1. NorNedNorway to Netherlands · 700 MW · In service
  2. NordLinkNorway to Germany · 1,400 MW · In service
  3. Viking LinkGreat Britain to Denmark · 1,400 MW · In service
  4. Great Belt Power Linkwithin Denmark · 600 MW · In service

All power links on the map