Guides
Guides to what is happening on Europe's grid
Longer pieces on the events and plans that the link figures alone do not explain.
On 28 April 2025 Spain and Portugal lost almost all of their electricity within seconds. Less than three months earlier Estonia, Latvia and Lithuania had cut their last synchronous tie to the Russian grid and joined the continental system. In both, the links to neighbouring grids were part of the story, the thing this site maps.
The guides below take one subject at a time, with the sources for every figure.
Five subjects, one grid
The Iberian blackout. Just after half past twelve on a sunny Monday, about 31 GW of demand vanished from Spain and Portugal in seconds. The guide to the blackout of 28 April 2025 follows ENTSO-E’s investigation minute by minute, from two oscillations in the late morning to the voltage rise that tripped one generator after another. Most blackouts start with too little power. This one started with voltage climbing too high, and the guide explains why a grid full of solar at noon can struggle to hold it down.
Grid congestion. German grid operators paid a little over €3 billion in 2025 to manage bottlenecks on the transmission network, and still had to curtail about 3.5% of its renewable output. The congestion guide explains why a market that treats a whole country as one copper plate keeps colliding with wires that were laid out for coal and nuclear plants in the south and west.
Energy islands. Bornholm, the Danish island in the Baltic, is meant to collect 3 GW of offshore wind in the 2030s and pass it on to both Germany and Zealand. The energy islands guide covers the hub-and-spoke idea behind it: one set of cables that carries wind power ashore when it blows and trade between countries when it does not.
Subsea power cables. On Christmas Day 2024 an anchor dragged across the Gulf of Finland and took Estlink 2 out of service for about six months. The subsea cables guide starts from that fault and works through what a cable is made of, how it is laid and buried, and why a repair on the seabed takes months. A scroll from the sea surface down to the cable is built into the page.
The Baltic switchover. In February 2025 Estonia, Latvia and Lithuania left the Russian-controlled grid and, after roughly 29 hours running on their own, joined the continental system. The Baltic synchronisation guide tells the story from the BRELL agreement of 2001 to the morning the last lines were opened.
The five have more in common than it first seems. Each turns on the links between grids: the Iberian peninsula had too few of them, Germany has too few inside its own borders, Bornholm is an attempt to build a new kind, a subsea cable is the most exposed kind, and the Baltic states rebuilt theirs to change which grid they belong to. Each guide links to the power links involved, so the figures can be checked on the map.
Renewables and the grid
The shorter pieces further down began as articles on renewable energy in Europe. Each has since been rewritten with sources: how the EU’s rules pull renewables onto the grid, how large companies buy green power and what their certificates really change, how solar, wind and hydro plants each behave on a network, and how the casino industry has moved some of its energy use to solar. They make a lighter starting point than the long guides, and most of them link on to the power-link map where the physical side of the story sits.
Every guide opens with the key facts in four lines and ends with questions and answers, for readers who want the short version first. The figures carry their sources, and where official reports disagree, as the Spanish and European investigations of the Iberian blackout do on who carries the blame, the guide sets out both.
Guides
-
Guide
Subsea power cables: how installation, protection and repair work on the seabed
How subsea power cables are built, laid and buried, how they are protected from anchors and trawls, and how faults such as Estlink 2 are repaired.
-
Guide
Energy islands: Bornholm, the North Sea island and Princess Elisabeth
Where Europe's energy islands stand in 2026: Bornholm's hub for Denmark and Germany, the delayed North Sea island and Belgium's Princess Elisabeth Island.
-
Guide
The Iberian blackout of 28 April 2025: what happened, second by second
Timeline of the 28 April 2025 blackout in Spain and Portugal, what the ENTSO-E panel and the Spanish government found, and what is still disputed.
-
Guide
Baltic synchronisation: leaving BRELL and joining the European grid
How Estonia, Latvia and Lithuania left the Russian-run BRELL grid on 8 February 2025 and joined the Continental European system the next day.
-
Guide
Grid congestion: why Europe pays billions to move power it already has
What grid congestion is, what redispatch and curtailment cost in Germany and the EU, why Dutch firms wait for connections, and which fixes work.
Renewables and the grid
-
Industry
The Casino Industry Adopts Renewable Energy Sources
How online and land-based casinos cut their energy use: greener data centres and payments online, solar arrays in Las Vegas and Atlantic City.
-
Energy mix
European Renewable Energy Integration Blog
Which EU countries use the most renewable energy, which trail, and how interconnectors and national grids explain the gap. Eurostat figures for 2025.
-
Explainer
How do different types of renewable energy work? Sun, wind and water
How solar panels, wind turbines and hydro plants turn sun, wind and water into electricity, and what each one asks of Europe's power grid.
-
Industry
European businesses using renewable energy: ways to buy green power
How Unilever, SAP and Amazon buy renewable power in Europe, what PPAs and certificates really change, and why the grid decides what a pledge is worth.
-
Policy
How the EU boosts renewable energy integration: targets and the grid
RED III sets a binding 42.5 % renewable share for 2030. How the EU pairs that target with faster permits, interconnection goals and grid money.
Questions
What caused the Iberian blackout of 28 April 2025?
A voltage collapse in the upward direction: voltage on the Spanish grid kept rising, and generating plants tripped one after another as it did, until about 31 GW of demand was lost. Neither the Spanish nor the European investigation found a cyber-attack.
What is grid congestion?
A line, cable or transformer that the market would load beyond its limit. The operator then orders plants down behind the bottleneck and up in front of it. In Germany that cost €3.071 billion in 2025.
What is an energy island?
A hub that collects offshore wind from several farms and sends it to more than one country, so the same cables carry wind power when it blows and trade when it does not. Bornholm is to take 3 GW and pass 2 GW to Germany and 1.2 GW to Zealand.
What damages subsea power cables?
Almost every serious fault that is not an insulation failure starts with something dragged along the seabed, an anchor or fishing gear. An anchor cut Estlink 2 on Christmas Day 2024, and the repair took about six months.
When did the Baltic states join the European grid?
On 9 February 2025, after leaving the Russian-run system the day before and running on their own for about 29 hours.