In service · HVDC · subsea
IFA2
The second France and England interconnector, built west of the Dover crossing to reach the grids of Hampshire and Normandy.
Route © OpenStreetMap contributors; outlines: Natural Earth.
- Route
- Great Britain to France
- From
- Chilling / Daedalus, Hampshire
- To
- Tourbe, Normandy
- Length
- 204 km
- Capacity
- 1,000 MW
- Voltage
- 320 kV
- Type
- HVDC · VSC · subsea and land cable
- Status
- In service (checked September 2026)
- In service since
- 2021
- Operators
- National Grid, RTE
- Built by
- ABB (now Hitachi Energy) converters; Prysmian cable
On 22 January 2021 IFA2 went into live operation, and its opening flow ran from France to the UK. A week later, on the morning of 29 January, it tripped and took 900 MW off the British grid at once; grid-scale batteries responded and limited the fall in frequency. For a new link, that was an early test of how the system copes when a large import disappears without warning.
The route sits well west of the original IFA crossing. On the English side the cable comes ashore at Monks Hill Beach near Lee-on-the-Solent, beside the former Daedalus airfield, and connects to the Chilling 400 kV substation near Warsash in Hampshire. In France it lands east of Merville-Franceville-Plage, near Caen, and runs inland to the Tourbe 400 kV substation in Normandy. The whole link is 204 km long.
The timeline was short by the standards of subsea projects. The European Commission identified IFA2 as key infrastructure in 2015, contracts went to Prysmian for the cable and ABB for the converters in 2017, and the UK converter building was finished in October 2019. The cable was energised for the first time on 15 October 2020, as set out in the IFA-2 article.
IFA2 is a joint venture of National Grid and RTE, the French transmission operator, the same pairing that owns the original IFA. It uses voltage-source converters, which Hitachi Energy supplied, and runs at ±320 kV, a pairing now common on European links of this size (see the HVDC explainer).
The operators give the total route as 204 km, without a separate figure for the seabed section.
Against the other links
- 32nd longest of the 54 links with a published length; the longest is Tyrrhenian Link at 970 km.
- 25th largest by capacity of 60; SuedLink leads with 4,000 MW.
- Other links from the same countries: Bay of Biscay Interconnection, BritNed, Caithness–Moray HVDC Link, Celtic Interconnector, East–West Interconnector, Eastern Green Link 1, Eastern Green Link 2, Greenlink and 14 more.
IFA2 in brief
How long is IFA2?
204 km, which makes it the 32nd longest of the 54 links in this directory with a published length.
How much power can IFA2 carry?
1,000 MW at 320 kV, 25th of 60 by capacity here.
When did IFA2 open?
IFA2 entered service in 2021.
Which countries does IFA2 connect?
Great Britain and France: Chilling / Daedalus, Hampshire to Tourbe, Normandy.
Who operates IFA2?
National Grid and RTE.
Who built IFA2?
ABB (now Hitachi Energy) converters; Prysmian cable.