In service · HVDC · subsea
NordLink
The first direct power link between Norway and Germany, pairing Norwegian reservoirs with German wind.
Route © OpenStreetMap contributors; outlines: Natural Earth.
- Route
- Norway to Germany
- From
- Tonstad (Ertsmyra), Sirdal
- To
- Wilster, Schleswig-Holstein
- Length
- 623 km
- Of which subsea
- 516 km
- Capacity
- 1,400 MW
- Voltage
- 525 kV
- Type
- HVDC · VSC · subsea and land cable
- Status
- In service (checked September 2026)
- In service since
- 2021
- Operators
- Statnett, TenneT, KfW
- Built by
- ABB/Hitachi Energy (converters); Nexans and NKT (cable)
For almost a minute in September 2020, during testing, NordLink accidentally imported its full 1,400 MW into Norway. The surge shifted the frequency of the Nordic grid by 0.5 Hz, a large jolt, according to the NordLink article. It showed how much weight one cable carries between two synchronous areas.
Statnett’s own summary of the purpose is a single sentence: Norwegian hydropower and German wind energy complement each other. When German turbines produce more than the country can use, Norway can import and hold water back in its reservoirs; when the wind drops, the flow reverses.
The route has three parts. From the converter at Ertsmyra near Tonstad, in Sirdal, a 53 km overhead line on 140 towers crosses Norway to the coast. A 516 km submarine cable runs under the North Sea to the German shore at Büsum, and a 54 km land cable carries it to the converter station at Wilster in Schleswig-Holstein.
Statnett and E.ON Netz launched a feasibility study in 2008, and financing was decided in 2015. Trial operation began on 9 December 2020, the partners took the link over from the suppliers on 31 March 2021, and the opening ceremony was held on 27 May 2021, as Statnett announced. The owners are Statnett, TenneT and the German state bank KfW. Hitachi ABB Power Grids supplied the converters and Nexans and NKT the cables, and the total cost was estimated at €1.7 to 1.8 billion, about half of it paid by Statnett.
The cable is only as useful as the grids on either side. In November 2021 higher exports from Norway to the Continent led to a dispute with the Swedish system operator, which cut export capacity in half; more generally, grid limits on land frequently restrict what the cable can carry. The grid congestion guide explains the problem. Sources differ on the length (623 km or 625 km) and voltage (525 kV or 500 kV); the figures above follow Statnett and Hitachi Energy. Statnett expects the link to run for 40 years.
Against the other links
- 8th longest of the 54 links with a published length; the longest is Tyrrhenian Link at 970 km.
- 14th largest by capacity of 60; SuedLink leads with 4,000 MW.
- Other links from the same countries: ALEGrO, Baltic Cable, Bornholm Energy Island, Hansa PowerBridge, Kontek, Kriegers Flak Combined Grid Solution, NeuConnect, North Sea Link and 2 more.
NordLink in brief
How long is NordLink?
623 km, of which 516 km under the sea, which makes it the 8th longest of the 54 links in this directory with a published length.
How much power can NordLink carry?
1,400 MW at 525 kV, 14th of 60 by capacity here.
When did NordLink open?
NordLink entered service in 2021.
Which countries does NordLink connect?
Norway and Germany: Tonstad (Ertsmyra), Sirdal to Wilster, Schleswig-Holstein.
Who operates NordLink?
Statnett and TenneT and KfW.
Who built NordLink?
ABB/Hitachi Energy (converters); Nexans and NKT (cable).