Best Paths

In service · HVDC · subsea

COMETA (Peninsula–Mallorca)

Spain's first HVDC subsea link, which tied the Balearic grid to the mainland in 2012.

Route © OpenStreetMap contributors; outlines: Natural Earth.

Route
within Spain
From
Morvedre, Sagunto
To
Santa Ponsa, Mallorca
Length
244 km
Of which subsea
237 km
Capacity
400 MW
Voltage
250 kV
Type
HVDC · LCC · subsea cable
Status
In service (checked September 2026)
In service since
2012
Operators
Red Eléctrica
Built by
Siemens (converters); Prysmian and Nexans (cable)

Mallorca’s electricity used to stop at the shoreline. On 14 August 2012 Red Eléctrica brought into service the first cable to connect the Balearic Islands to mainland Spain; until then Mallorca and Menorca had run as an isolated system. The project was called Rómulo by Red Eléctrica and is also known as COMETA, and it was Spain’s first high-voltage direct-current link under the sea.

It starts at the Morvedre substation near Sagunto, north of Valencia, and ends at Santa Ponsa, south-west of Palma de Mallorca. The sea crossing is about 237 km. At its deepest the cable lies 1,485 metres down, which Red Eléctrica described at the time as the second-greatest depth in the world for a power cable of its kind. SAPEI, off Sardinia, was deeper.

The contracts were signed in the autumn of 2007: with Nexans and Prysmian on 26 September for the cables, and with Siemens on 9 October for the converter stations. Laying began on 13 January 2011 for the first cable and on 27 January for the second, using the ships Giulio Verne and Nexans Skagerrak. The link began carrying power at reduced capacity early in 2012 and reached full capacity that August, according to the Wikipedia article on COMETA.

The total cost was €375 million: €275 million for the cable and €50 million for each of the two converter stations, according to Red Eléctrica. Wikipedia cites savings of about €25 million in the first quarter of operation.

The link is a bipole of two 200 MW cables, for 400 MW, at 250 kV. That makes it modest next to newer Mediterranean projects such as the Tyrrhenian Link, but for a system the size of Mallorca’s it was a large step. Sources disagree on the year: Wikipedia’s list of HVDC projects gives 2011, its article on the link gives 2012.

The Balearic network has grown since, with AC links planned from Mallorca to Ibiza and Formentera; Wikipedia mentions a 115 km cable at 132 kV. The larger question of how islands join continental grids is covered in the guide to energy islands.

Against the other links

  • 28th longest of the 54 links with a published length; the longest is Tyrrhenian Link at 970 km.
  • 53rd largest by capacity of 60; SuedLink leads with 4,000 MW.

COMETA (Peninsula–Mallorca) in brief

How long is COMETA (Peninsula–Mallorca)?

244 km, of which 237 km under the sea, which makes it the 28th longest of the 54 links in this directory with a published length.

How much power can COMETA (Peninsula–Mallorca) carry?

400 MW at 250 kV, 53rd of 60 by capacity here.

When did COMETA (Peninsula–Mallorca) open?

COMETA (Peninsula–Mallorca) entered service in 2012.

Which countries does COMETA (Peninsula–Mallorca) connect?

It runs within Spain, from Morvedre, Sagunto to Santa Ponsa, Mallorca.

Who operates COMETA (Peninsula–Mallorca)?

Red Eléctrica.

Who built COMETA (Peninsula–Mallorca)?

Siemens (converters); Prysmian and Nexans (cable).

Background reading

  1. GuideThe Iberian blackout of 28 April 2025: what happened, second by second
  2. GuideSubsea power cables: how installation, protection and repair work on the seabed
  3. Direct currentHVDC transmission explained: the cable, the converter station and why DC wins

Nearby links

  1. INELFE (Baixas–Santa Llogaia)France to Spain · 2,000 MW · In service
  2. Bay of Biscay InterconnectionSpain to France · 2,000 MW · Under construction
  3. SACOI (Sardinia–Corsica–Italy)Italy to France · 300 MW · In service
  4. SACOI 3Italy to France · 400 MW · Under construction

All power links on the map