In service · HVDC · subsea
Moyle Interconnector
The link between the British grid and the all-island Irish market, owned by a mutual company and repaired more often than most.
Route © OpenStreetMap contributors; outlines: Natural Earth.
- Route
- Great Britain to Northern Ireland
- From
- Auchencrosh, South Ayrshire
- To
- Ballycronan More, Co. Antrim
- Length
- 63.5 km
- Of which subsea
- 55 km
- Capacity
- 500 MW
- Voltage
- 250 kV
- Type
- HVDC · LCC · subsea cable
- Status
- In service (checked September 2026)
- In service since
- 2001
- Operators
- Mutual Energy
- Built by
- Siemens (converters); Nexans (cable)
For much of its life the Moyle Interconnector could send only 80 MW from Northern Ireland to Scotland. The cable was rated at 500 MW, but transmission constraints on the National Grid side limited exports to a fraction of that. Coordinated work raised the export limit to 250 MW and then, in 2021, to the full 500 MW.
Moyle crosses the North Channel between Auchencrosh in South Ayrshire and Ballycronan More in County Antrim. The route is 63.5 km long and 55 km of it is subsea. Both ends are in the United Kingdom, so it is not a cross-border link in the strict sense, but it connects two separate electricity markets: Great Britain and the all-island Irish market that Northern Ireland shares with Ireland.
It went into service in 2001 as a dual monopole at 250 kV, with the return conductors built into the cables. That design caused most of the trouble that followed. In August 2011 the link went out of service; it returned in February 2012 at 450 MW. The integrated return conductors failed, and new separate metallic return conductors were installed in 2016 to restore the full 500 MW. In February 2017 one high-voltage cable developed a further fault, halving capacity to 250 MW until September 2017. A major refurbishment of the control and protection systems followed in 2022, carried out one pole at a time. The Moyle Interconnector article sets out the sequence.
A second link on almost the same crossing is now planned: LirIC, from Hunterston to Kilroot, would add 700 MW by 2032. Siemens built Moyle’s converters and Nexans its cables, and the link is owned by Mutual Energy. For how cable faults like these are found and repaired, see subsea power cables. LirIC’s planned 700 MW is more than Moyle’s full rating, on a crossing roughly twice as long at 142 km.
Against the other links
- 52nd longest of the 54 links with a published length; the longest is Tyrrhenian Link at 970 km.
- 52nd largest by capacity of 60; SuedLink leads with 4,000 MW.
- Other links from the same countries: AQUIND Interconnector, BritNed, Caithness–Moray HVDC Link, Eastern Green Link 1, Eastern Green Link 2, ElecLink, Greenlink, IFA (Interconnexion France-Angleterre) and 8 more.
Moyle Interconnector in brief
How long is Moyle Interconnector?
63.5 km, of which 55 km under the sea, which makes it the 52nd longest of the 54 links in this directory with a published length.
How much power can Moyle Interconnector carry?
500 MW at 250 kV, 52nd of 60 by capacity here.
When did Moyle Interconnector open?
Moyle Interconnector entered service in 2001.
Which parts of the UK does Moyle Interconnector connect?
Great Britain and Northern Ireland, both in the United Kingdom: Auchencrosh, South Ayrshire to Ballycronan More, Co. Antrim.
Who operates Moyle Interconnector?
Mutual Energy.
Who built Moyle Interconnector?
Siemens (converters); Nexans (cable).