Best Paths

In service · HVDC · subsea

Fenno-Skan 1

The first HVDC cable between Finland and Sweden, and in 1989 the longest submarine power cable in the world.

Route © OpenStreetMap contributors; outlines: Natural Earth.

Route
Finland to Sweden
From
Rauma
To
Dannebo
Length
233 km
Of which subsea
200 km
Capacity
500 MW
Voltage
400 kV
Type
HVDC · LCC · subsea and land cable
Status
In service (checked September 2026)
In service since
1989
Operators
Fingrid, Svenska kraftnät
Built by
ABB; Nexans

When Fenno-Skan went into commercial operation in November 1989, no submarine power cable anywhere was longer. It was also the first HVDC cable to run at 400 kV. About 200 km of it lies on the floor of the Gulf of Bothnia, between the Finnish and Swedish coasts.

The link is a monopole: one high-voltage conductor, with the return path through electrodes at each end. The Fenno–Skan article on Wikipedia describes the electrode lines as overhead conductors carried on wooden poles in both countries. On the Finnish side a 33 km overhead line brings the power from the coast to the converter station at Rauma; on the Swedish side the station is at Dannebo, north of Stockholm. ABB built the converters and Nexans the cable. The rated power is 500 MW, with 550 MW given as the maximum.

For thirty years it did the job it was built for, letting Finnish and Swedish power flow across the gulf in whichever direction prices pulled it. In 2011 Fenno-Skan 2 joined it at Rauma, sharing the Finnish end.

The question since then has been age. The link’s expected technical lifetime originally ran out in the late 2020s. In March 2021 Fingrid and Svenska kraftnät signed a framework agreement to extend its life until at least 2040, which buys time without pretending the cable is new.

The replacement already has a name. In 2025 the two operators signed a letter of intent to plan Fenno-Skan 3, an 800 MW cable meant to take over from Fenno-Skan 1 at the end of its life, with completion expected by 2038. The Fingrid announcement says the grid study should be done by the end of 2026. If the schedule holds, the 1989 cable will have run for close to half a century before it is switched off.

Against the other links

Fenno-Skan 1 in brief

How long is Fenno-Skan 1?

233 km, of which 200 km under the sea, which makes it the 31st longest of the 54 links in this directory with a published length.

How much power can Fenno-Skan 1 carry?

500 MW at 400 kV, 48th of 60 by capacity here.

When did Fenno-Skan 1 open?

Fenno-Skan 1 entered service in 1989.

Which countries does Fenno-Skan 1 connect?

Finland and Sweden: Rauma to Dannebo.

Who operates Fenno-Skan 1?

Fingrid and Svenska kraftnät.

Who built Fenno-Skan 1?

ABB; Nexans.

Background reading

  1. GuideSubsea power cables: how installation, protection and repair work on the seabed
  2. Direct currentHVDC transmission explained: the cable, the converter station and why DC wins

Nearby links

  1. Fenno-Skan 2Finland to Sweden · 800 MW · In service
  2. Estlink 3Estonia to Finland · 700 MW · Planned
  3. Estlink 1Estonia to Finland · 350 MW · In service
  4. Estlink 2Estonia to Finland · 650 MW · In service

All power links on the map