In service · HVDC · subsea
NorNed
Once the longest submarine power cable in the world, linking Norwegian hydropower with the Dutch market.
Route © OpenStreetMap contributors; outlines: Natural Earth.
- Route
- Norway to Netherlands
- From
- Feda, Kvinesdal
- To
- Eemshaven, Groningen
- Length
- 580 km
- Of which subsea
- 580 km
- Capacity
- 700 MW
- Voltage
- 450 kV
- Type
- HVDC · LCC · subsea cable
- Status
- In service (checked September 2026)
- In service since
- 2008
- Operators
- Statnett, TenneT
- Built by
- ABB (converters and cable); Nexans (cable)
Two months after it opened, NorNed had earned about €50 million. The owners had projected €64 million for a full year, so the cable was running well ahead of plan almost from the first day, as the NorNed article records. The first commercial transfer took place on 6 May 2008, the day after commercial operations formally began.
The link runs 580 km from Feda, in Kvinesdal on Norway’s south coast, across the North Sea to Eemshaven in Groningen, the whole way as submarine cable. When it was finished it was the longest submarine power cable in the world. Laying the first sections began in early 2006 and the final section went down by the end of 2007.
The purpose was to connect Norway’s hydroelectric capacity to the markets of continental Europe, with the Netherlands as the first stop. Statnett and TenneT own the cable jointly.
NorNed was budgeted at €550 million and came in at €600 million. Hitachi Energy, whose predecessor ABB built the converters and much of the cable, gives the rating as 700 MW at ±450 kV. Losses are about 4.2%, an efficiency of 95.8% over the full distance, and that low loss over distance is one of the arguments for HVDC at sea.
ABB made the converters and part of the cable, and Nexans supplied the rest, per the dataset’s sources. The cable has had two long outages. A fault in 2011 kept it out of operation for seven weeks, and another developed in May 2022, with restoration expected by October that year. The 2022 fault was expected to keep the link out for about five months, a long gap for a cable that had earned its budgeted annual revenue in well under a year at the start.
Eemshaven has since become a junction. The COBRAcable to Denmark starts from the same Dutch port, which means Norwegian and Danish power both land in the same port in the far north of the Netherlands.
Against the other links
- 9th longest of the 54 links with a published length; the longest is Tyrrhenian Link at 970 km.
- 39th largest by capacity of 60; SuedLink leads with 4,000 MW.
- Other links from the same countries: BritNed, LionLink, North Sea Link.
NorNed in brief
How long is NorNed?
580 km, of which 580 km under the sea, which makes it the 9th longest of the 54 links in this directory with a published length.
How much power can NorNed carry?
700 MW at 450 kV, 39th of 60 by capacity here.
When did NorNed open?
NorNed entered service in 2008.
Which countries does NorNed connect?
Norway and Netherlands: Feda, Kvinesdal to Eemshaven, Groningen.
Who operates NorNed?
Statnett and TenneT.
Who built NorNed?
ABB (converters and cable); Nexans (cable).