Best Paths

In service · HVDC · subsea

SwePol Link

A 600 MW cable under the Baltic that carries mostly Swedish power south to Poland.

Route © OpenStreetMap contributors; outlines: Natural Earth.

Route
Sweden to Poland
From
Stärnö, near Karlshamn
To
Bruskowo Wielkie, near Słupsk
Length
254 km
Of which subsea
239 km
Capacity
600 MW
Voltage
450 kV
Type
HVDC · LCC · subsea cable
Status
In service (checked September 2026)
In service since
2000
Operators
Svenska kraftnät, PSE
Built by
ABB

In 2023 SwePol carried 4.0 TWh south from Sweden to Poland and just 0.3 TWh north. The first figure used 77% of the link’s technical capacity, the second 5%, according to the SwePol article.

The route is almost all sea. From the converter station on the Stärnö peninsula near Karlshamn, 2.22 km of underground cable reaches the shore, and then 239.28 km of submarine cable crosses the Baltic to landfall near Ustka on the Polish coast. The last 12.55 km runs underground to the converter at Bruskowo Wielkie, near Słupsk. The total is 254.05 km, although the List of HVDC projects gives 245 km.

The design was chosen with the environment in mind. The older Baltic Cable to Germany returns its current through the sea between electrodes. SwePol instead uses a metallic return: two cables of 630 mm² on the submarine section and a single cable of 1,100 mm² on land. Hitachi Energy, whose predecessor ABB built the link, describes the result as a completely closed HVDC cable system with no current through the seabed.

Commercial operation began in August 2000. The link was first owned by Svenska kraftnät (51%), Vattenfall (16%) and the Polish operator PSE (33%); today Svenska kraftnät and PSE hold it. On 14 February 2005 a fire destroyed the smoothing reactor at Bruskowo Wielkie, and repairs took 20 hours. In 2022, after the sabotage of the Nord Stream pipelines, tests confirmed the cable had not been damaged. A 2024 upgrade replaced the complete HVDC control and protection equipment.

Poland’s other Baltic neighbour is reached by land, over the AC LitPol Link to Lithuania. SwePol’s 2023 numbers leave no doubt about its role: it is an export route for SE4, Sweden’s southernmost bidding zone.

Against the other links

SwePol in brief

How long is SwePol?

254 km, of which 239 km under the sea, which makes it the 27th longest of the 54 links in this directory with a published length.

How much power can SwePol carry?

600 MW at 450 kV, 46th of 60 by capacity here.

When did SwePol open?

SwePol entered service in 2000.

Which countries does SwePol connect?

Sweden and Poland: Stärnö, near Karlshamn to Bruskowo Wielkie, near Słupsk.

Who operates SwePol?

Svenska kraftnät and PSE.

Who built SwePol?

ABB.

Background reading

  1. GuideSubsea power cables: how installation, protection and repair work on the seabed
  2. Direct currentHVDC transmission explained: the cable, the converter station and why DC wins

Nearby links

  1. Bornholm Energy IslandDenmark to Germany · 2,000 MW · Planned
  2. NordBaltSweden to Lithuania · 700 MW · In service
  3. Hansa PowerBridgeSweden to Germany · 700 MW · Cancelled
  4. Kriegers Flak Combined Grid SolutionDenmark to Germany · 400 MW · In service

All power links on the map