Best Paths

In service · HVDC · subsea

Great Belt Power Link

The DC cable under the Great Belt that finally connected eastern and western Denmark, whose grids run on different synchronous systems.

Route drawn between the landing points; outlines: Natural Earth.

Route
within Denmark
From
Fraugde, Funen
To
Herslev, Zealand
Length
56 km
Capacity
600 MW
Voltage
400 kV
Type
HVDC · LCC · subsea and land cable
Status
In service (checked September 2026)
In service since
2010
Operators
Energinet
Built by
Siemens (converters)

Until 2010 Denmark had two electricity grids that could not be joined directly. The western half, Jutland and Funen, runs in step with continental Europe. The eastern half, Zealand with Copenhagen, runs in step with the Nordic countries. Because the two systems are not synchronised, the only way to connect them is through direct current.

The Great Belt Power Link, also called Storebælt HVDC, fixed that. The decision was taken in December 2005. The route starts at the Fraugde converter station on Funen, runs 16 km underground to the coast, crosses the Great Belt in a 32 km sea cable, and continues 10 km underground on Zealand to the Herslev station. The cable was laid in July 2009 by JD-Contractor with the cable ship Henry P. Lading.

The link was commissioned in July 2010, started commercial operation in August and was inaugurated on 7 September 2010. The Wikipedia article on the link gives the cost as DKK 1.29 billion. Energinet, the Danish system operator, owns it, and Siemens supplied the converters.

Its stated purpose was practical: to make better use of the power system, share reserves, create a common market for regulating power and improve the working of the market.

The figures differ slightly by source. Wikipedia’s sections add up to 58 km, while this page gives 56 km, from the List of HVDC projects. The difference is small, but you should know it exists before quoting either.

Denmark’s two grids remain separate synchronous systems; the link is a bridge between them, not a merger. How DC makes that possible is set out in the HVDC explainer. Of the whole route, only the 32 km crossing is under water; the rest lies buried in the fields of Funen and Zealand.

Against the other links

Great Belt Power Link in brief

How long is Great Belt Power Link?

56 km, which makes it the 53rd longest of the 54 links in this directory with a published length.

How much power can Great Belt Power Link carry?

600 MW at 400 kV, 42nd of 60 by capacity here.

When did Great Belt Power Link open?

Great Belt Power Link entered service in 2010.

Which countries does Great Belt Power Link connect?

It runs within Denmark, from Fraugde, Funen to Herslev, Zealand.

Who operates Great Belt Power Link?

Energinet.

Who built Great Belt Power Link?

Siemens (converters).

Background reading

  1. GuideSubsea power cables: how installation, protection and repair work on the seabed
  2. Direct currentHVDC transmission explained: the cable, the converter station and why DC wins

Nearby links

  1. Kriegers Flak Combined Grid SolutionDenmark to Germany · 400 MW · In service
  2. KontekDenmark to Germany · 600 MW · In service
  3. Baltic CableGermany to Sweden · 600 MW · In service
  4. Hansa PowerBridgeSweden to Germany · 700 MW · Cancelled

All power links on the map