Under construction · HVDC · subsea
Eastern Green Link 2
The longest of Britain's new east-coast cables, from Aberdeenshire to the Drax power station in Yorkshire.
Route © OpenStreetMap contributors; outlines: Natural Earth.
- Route
- within Great Britain
- From
- Peterhead, Aberdeenshire
- To
- Drax, North Yorkshire
- Length
- 505 km
- Of which subsea
- 436 km
- Capacity
- 2,000 MW
- Voltage
- 525 kV
- Type
- HVDC · VSC · subsea and land cable
- Status
- Under construction (checked September 2026)
- Expected
- 2029
- Operators
- SSEN Transmission, National Grid
- Built by
- Hitachi Energy (converters); Prysmian (cable)
Sandford Bay, just south of Peterhead in Aberdeenshire, is where Eastern Green Link 2 enters the sea. The cable then runs 436 km down the North Sea, about 150 km in Scottish waters and 286 km in English waters, before coming ashore at Fraisthorpe Sands, south of Bridlington in the East Riding of Yorkshire. An onshore cable takes it on to Drax, the site of Britain’s largest power station, where it joins the grid. The whole route is 505 km.
The marine licences came in 2023, from Marine Scotland in May and the Marine Management Organisation in July. Ofgem gave its final approvals in August 2024, and construction began the following month. The project is a joint venture between SSEN Transmission, which owns the grid in the north of Scotland, and National Grid. The Eastern Green Links article on Wikipedia names Prysmian, Hitachi Energy and BAM as the main contractors, and gives the same ±525 kV voltage-source design as its sister project.
The purpose is capacity from north to south. At 2,000 MW, EGL2 adds as much as Eastern Green Link 1, but it starts much further north, in Aberdeenshire, and ends deeper into England. Wikipedia says the link is meant to “alleviate existing and future constraints on the electricity transmission network”.
The cost figure depends on the date. Wikipedia gives a budget of £4.3 billion; Energy Voice reported that Ofgem approved £3.4 billion. The reports do not make clear what each figure covers, and the final outturn will be known only at completion.
Marine works were planned from mid-2026, and the target for energisation is 2029. EGL2 will not be the last: in December 2025 Ofgem approved two further links, EGL3 and EGL4, targeted for 2033 and 2034. The west-coast precedent for all of them is the Western HVDC Link, in service since 2018.
Against the other links
- 11th longest of the 54 links with a published length; the longest is Tyrrhenian Link at 970 km.
- 7th largest by capacity of 60; SuedLink leads with 4,000 MW.
- Other links from the same countries: AQUIND Interconnector, BritNed, Caithness–Moray HVDC Link, East–West Interconnector, ElecLink, Greenlink, IFA (Interconnexion France-Angleterre), IFA2 and 8 more.
Eastern Green Link 2 in brief
How long is Eastern Green Link 2?
505 km, of which 436 km under the sea, which makes it the 11th longest of the 54 links in this directory with a published length.
How much power can Eastern Green Link 2 carry?
2,000 MW at 525 kV, 7th of 60 by capacity here.
When will Eastern Green Link 2 be finished?
The published target is 2029.
Which countries will Eastern Green Link 2 connect?
It will run within Great Britain, from Peterhead, Aberdeenshire to Drax, North Yorkshire.
Who is behind Eastern Green Link 2?
SSEN Transmission and National Grid.
Who built Eastern Green Link 2?
Hitachi Energy (converters); Prysmian (cable).