Estlink 1

The first power link between the Baltic states and the Nordic market, laid under the Gulf of Finland in 2006.

Route © OpenStreetMap contributors; outlines: Natural Earth.

Route
Estonia to Finland
From
Harku, near Tallinn
To
Espoo
Length
105 km
Of which subsea
74 km
Capacity
350 MW
Voltage
150 kV
Type
HVDC · VSC · subsea cable
Status
In service (checked September 2026)
In service since
2006
Operators
Elering, Fingrid
Built by
ABB (now Hitachi Energy)

Talks on a cable between Estonia and Finland started in 1999. For six years nothing was built, and the Baltic grid stayed almost cut off from the West, tied instead to Russia and Belarus. A harsh winter finally pushed the project forward, and Estlink 1 was completed in 2006.

It was not built by the grid operators. The owner was AS Nordic Energy Link, a company of utilities: Eesti Energia held 39.9%, Latvenergo and Lietuvos Energija 25% each, and Pohjolan Voima with Helsingin Energia the remaining 10.1%. Work was launched on 29 April 2005, the subsea cable went down in September 2006, the link was inaugurated on 4 December 2006 and it became fully operational on 5 January 2007. The Estlink article on Wikipedia puts the cost at €110 million. On 30 December 2013 the utilities sold it to the two national operators, Elering and Fingrid, who run it today.

Technically it was an early example of the voltage-source approach described on the HVDC explainer. Hitachi Energy, which built it as ABB, notes that the whole route is either underground or underwater, with extruded oil-free cables and no overhead line anywhere. The converters can also help restart the Estonian grid after a blackout, a black-start role that few links of its age were designed for.

Demand outran it quickly. The line soon became one of the most congested on the Nord Pool spot market, and that congestion is the reason Estlink 2 followed in 2014.

The older link has had its own trouble. On 1 September 2025 it tripped at 05:46 because of a fault in a reactor at the Espoo converter station. Elering said the evidence pointed to a technical fault, not sabotage, and repairs were estimated at about three weeks, as ERR News reported. Nord Pool messages gave 24 September as the return date.

The next step is a new brain for the old hardware: a MACH control and protection system, which Hitachi Energy says it will install in 2027 to extend the link’s working life.

Against the other links

  • 48th longest of the 54 links with a published length; the longest is Tyrrhenian Link at 970 km.
  • 57th largest by capacity of 60; SuedLink leads with 4,000 MW.
  • Other links from the same countries: Aurora Line.

Estlink 1 in brief

How long is Estlink 1?

105 km, of which 74 km under the sea, which makes it the 48th longest of the 54 links in this directory with a published length.

How much power can Estlink 1 carry?

350 MW at 150 kV, 57th of 60 by capacity here.

When did Estlink 1 open?

Estlink 1 entered service in 2006.

Which countries does Estlink 1 connect?

Estonia and Finland: Harku, near Tallinn to Espoo.

Who operates Estlink 1?

Elering and Fingrid.

Who built Estlink 1?

ABB (now Hitachi Energy).

Background reading

  1. GuideBaltic synchronisation: leaving BRELL and joining the European grid
  2. GuideSubsea power cables: how installation, protection and repair work on the seabed
  3. Direct currentHVDC transmission explained: the cable, the converter station and why DC wins

Nearby links

  1. Estlink 3Estonia to Finland · 700 MW · Planned
  2. Estlink 2Estonia to Finland · 650 MW · In service
  3. Fenno-Skan 1Finland to Sweden · 500 MW · In service
  4. Fenno-Skan 2Finland to Sweden · 800 MW · In service

All power links on the map