Best Paths

In service · HVAC · overhead

LitPol Link

The overhead line that tied Lithuania to Poland in 2015 and later carried the Baltic states into the Continental European grid.

Route © OpenStreetMap contributors; outlines: Natural Earth.

Route
Lithuania to Poland
From
Alytus
To
Ełk
Length
163 km
Capacity
500 MW
Voltage
400 kV
Type
HVAC · overhead line
Status
In service (checked September 2026)
In service since
2015
Operators
Litgrid, PSE
Built by
ABB (Alytus back-to-back converter)

On 9 December 2015, its first day in service, LitPol Link carried up to 200 MW from Poland to Lithuania. The link raised Poland’s interconnection level from 2% to 4%, according to the LitPol Link article.

The line runs on land. According to EPSO-G, the group that owns Litgrid, 51 km of the 400 kV line lies in Lithuania and 112 km in Poland, 163 km from Alytus to Ełk. Behind it, a 53 km 330 kV line links Alytus with Kruonis. Counting that section, the Wikipedia infobox gives 341 km; this page gives the operator group’s 163 km for the cross-border line.

For its first decade the link needed a large machine in the middle. Lithuania ran in step with the Russian-controlled IPS/UPS system, Poland with Continental Europe, and the two could not be joined directly. So a back-to-back converter station was built in Alytus, 200 metres long and 170 metres wide. Hitachi Energy, which supplied it turnkey as ABB, describes a single 500 MW block with thyristor valves, laid out so that a second 500 MW block could be added later. The line itself is AC; the converter turned the power into DC and straight back, in phase with the other side. The HVDC explainer describes the method.

That changed in February 2025, when the Baltic states disconnected from the Russian system and synchronised with Continental Europe. From then on LitPol could run as a plain synchronous line, and the Alytus converter became redundant. The guide to Baltic synchronisation tells that story.

The groundwork for that switch was laid years earlier. In November 2021 Litgrid finished a €22.5 million expansion at the Lithuanian end, The Baltic Times reported: the LitPol switchyard and the Alytus substation were rebuilt, nearby 330 kV and 110 kV lines were reconstructed, and three 600 MVA autotransformers were installed to tie the 400 kV line directly into the 330 kV grid. The work was part-funded by the EU’s Connecting Europe Facility, and Lithuania’s energy minister said at the time that the country could no longer be left an isolated energy island. The headline over that report called it a synchronisation-ready link, three years before the switch.

The project cost €340 million, well above the pre-feasibility estimate of €237 million. The feasibility study was finished in September 2002 and construction began on 5 May 2014, so the gap between study and spade was almost twelve years. LitPol is owned by a joint venture of PSE and Litgrid, based in Warsaw. A second line, Harmony Link, was first planned as a subsea cable and was redesigned in 2023 as an overland 220 kV connection from Ełk Bis to Gižai, due by the end of 2030.

Against the other links

  • 40th longest of the 54 links with a published length; the longest is Tyrrhenian Link at 970 km.
  • 51st largest by capacity of 60; SuedLink leads with 4,000 MW.

LitPol Link in brief

How long is LitPol Link?

163 km, which makes it the 40th longest of the 54 links in this directory with a published length.

How much power can LitPol Link carry?

500 MW at 400 kV, 51st of 60 by capacity here.

When did LitPol Link open?

LitPol Link entered service in 2015.

Which countries does LitPol Link connect?

Lithuania and Poland: Alytus to Ełk.

Who operates LitPol Link?

Litgrid and PSE.

Who built LitPol Link?

ABB (Alytus back-to-back converter).

Background reading

  1. GuideBaltic synchronisation: leaving BRELL and joining the European grid
  2. Demonstration 4Repowering transmission lines: reconductoring and dynamic line rating on Europe's AC grid

Nearby links

  1. Harmony LinkPoland to Lithuania · Planned
  2. NordBaltSweden to Lithuania · 700 MW · In service
  3. SwePolSweden to Poland · 600 MW · In service
  4. Bornholm Energy IslandDenmark to Germany · 2,000 MW · Planned

All power links on the map