Best Paths

In service · HVDC · subsea

SAPEI

The 1,000 MW cable from Sardinia to Lazio that was, when it opened in 2011, the deepest power cable in the world.

Route © OpenStreetMap contributors; outlines: Natural Earth.

Route
within Italy
From
Fiume Santo, Sardinia
To
Latina, Lazio
Length
435 km
Of which subsea
420 km
Capacity
1,000 MW
Voltage
500 kV
Type
HVDC · LCC · subsea cable
Status
In service (checked September 2026)
In service since
2011
Operators
Terna
Built by
ABB (converters); Prysmian (cable)

Sixteen hundred metres under the Tyrrhenian Sea, a cable about 12 cm across carries up to 1,000 MW between Sardinia and the Italian mainland. When SAPEI was inaugurated on 17 March 2011, no power cable anywhere lay deeper.

The ends are two converter stations. In Sardinia the link starts at Fiume Santo, near Sassari, on a site of 48,000 square metres; on the mainland it ends at Latina, in Lazio, on 35,000. About 15 km of land cable connect them to a 420 km submarine section. The SAPEI article on Wikipedia gives these figures and a cost of more than €730 million. Terna owns and runs it; Prysmian made the cable and ABB the converters.

Building it took five years. The project was launched in 2006, followed by scientific studies and geophysical surveys of the seabed. The first cable went down in 2008, the converter stations were working in 2009, and the second cable was laid at the end of 2010. The BEST PATHS project’s own report on the world’s top undersea HVDC cables, written in 2017, describes how the cable was held in place: on rocky seabed it was anchored with collars fixed by hand, and in sediment it was protected by burying it about a metre deep.

Why so much effort for one island? Sardinia had only one other link to the mainland, the small and ageing SACOI line through Corsica. SAPEI more than tripled the capacity between the island and the peninsula in one step. Because it is DC, it can cover the long distance and the great depth without the charging losses that would cripple an AC cable of that length.

SAPEI’s depth record did not last. In December 2025 Nexans laid a cable for the Tyrrhenian Link at 2,150 metres, and that project will give Sardinia a second high-capacity DC connection, this time to Sicily.

Against the other links

SAPEI in brief

How long is SAPEI?

435 km, of which 420 km under the sea, which makes it the 14th longest of the 54 links in this directory with a published length.

How much power can SAPEI carry?

1,000 MW at 500 kV, 28th of 60 by capacity here.

When did SAPEI open?

SAPEI entered service in 2011.

Which countries does SAPEI connect?

It runs within Italy, from Fiume Santo, Sardinia to Latina, Lazio.

Who operates SAPEI?

Terna.

Who built SAPEI?

ABB (converters); Prysmian (cable).

Background reading

  1. GuideSubsea power cables: how installation, protection and repair work on the seabed
  2. Direct currentHVDC transmission explained: the cable, the converter station and why DC wins

Nearby links

  1. SACOI (Sardinia–Corsica–Italy)Italy to France · 300 MW · In service
  2. SACOI 3Italy to France · 400 MW · Under construction
  3. Tyrrhenian Linkwithin Italy · 1,000 MW · Under construction
  4. MONITA (Italy–Montenegro)Italy to Montenegro · 600 MW · In service

All power links on the map